ABB & Siemens LV/MV SWGR Commissioning Multiple BGC Sites
Testing & Commissioning
Basra Gas Company (BGC)
Power & Energy / Oil & Gas
LV & MV Switchgear Commissioning
Completed
Project Overview
United Advanced Energy successfully executed LV and MV Switchgear Commissioning projects using ABB and Siemens systems across multiple Basra Gas Company sites.
The project focused on safe energization, functional verification, and performance validation of switchgear systems—ensuring reliable power distribution, effective protection, and compliance with international and utility standards.
Scope of Work
- Pre-commissioning inspection of ABB and Siemens LV/MV switchgear
- Verification of mechanical installation and interconnections
- Functional testing of circuit breakers and control circuits
- Protection relay testing and coordination verification
- Interlocking, alarm, and trip logic validation
- Safe energization and operational verification
- Commissioning documentation and test reports
Project Outcome
The commissioning activities were completed successfully, ensuring safe and reliable operation of switchgear systems across multiple BGC facilities.
United Advanced Energy delivered verified commissioning results and detailed documentation, supporting stable power distribution and operational readiness.
Conclusion
The ABB & Siemens LV/MV Switchgear Commissioning – Multiple BGC Sites project highlights United Advanced Energy’s expertise in testing, commissioning, and electrical system validation.
Through precise execution and adherence to standards, United Advanced Energy continues to support safe, reliable, and efficient power distribution infrastructure for the energy sector.