Siemens 33/3.3kV Substation Testing & Commissioning – BGC KAZ SS01 & CS7
Testing & Commissioning
Basra Gas Company (BGC)
Power & Energy / Oil & Gas
MV Substations & Power Transformers
Completed
Project Overview
United Advanced Energy successfully executed the Testing & Commissioning of Siemens 33/3.3kV Substation Systems for Basra Gas Company at KAZ SS01 and CS7 facilities.
The project focused on verifying substation performance, ensuring safe voltage transformation, and validating protection and control systems—supporting reliable power supply to critical gas processing operations.
Scope of Work
- Pre-commissioning inspection of Siemens 33/3.3kV substation equipment
- Testing of power transformers, MV switchgear, and auxiliary systems
- Protection relay testing and coordination verification
- Control, alarm, and interlocking logic validation
- HV and LV testing, insulation and functional checks
- Safe energization and load readiness verification
- Commissioning documentation and test reports
Project Outcome
The testing and commissioning activities were completed successfully, ensuring reliable and safe operation of the substations.
United Advanced Energy delivered verified test results and comprehensive documentation, supporting stable power distribution across BGC’s facilities.
Conclusion
The Siemens 33/3.3kV Substation Testing & Commissioning – BGC KAZ SS01 & CS7 project demonstrates United Advanced Energy’s expertise in medium-voltage substations and industrial power infrastructure commissioning.
Through professional execution and adherence to international standards, United Advanced Energy continues to support reliable and efficient energy operations.